DholeraHelp
Independent. Updated July 2026

Everything about Dholera,
answered.

Type a question and get a straight answer with its source named. Dholera SIR is the Special Investment Region that Gujarat is building about 100 km south-west of Ahmedabad. Where nobody has verified a number, this site tells you that rather than guessing.

Start typing and matching questions appear, or pick one of the six above. There are over 200 written answers here, and anything outside that set gets answered live.

DURABLEchecked, and unlikely to changeREPORTEDone source said it, on the date shownTARGETplanned. It has not happened yet
How this works

Built to be trusted, not to sell you a plot.

Almost everything written about Dholera is written by someone who wants to sell you land there. This site has nothing to sell, so it can afford to tell you when a number is shaky.

Answers name their source

Each answer says which document or report it came from and on what date, so you can go and read the original if you want to.

Every figure is labelled

A number is either checked, reported once by one source, or still only a plan. The label tells you which, so a planned airport date never reads like a finished airport.

Gaps stay gaps

When the only figure available comes from a broker listing, or there is no figure at all, the page says that plainly rather than filling the hole with a guess.

Dholera at a glance

Four numbers worth knowing before anything else.

These four figures come up in nearly every conversation about Dholera, and three of the four are solid. The jobs figure is the one people quote as though it were real, so read its label carefully.

~920 sq km
The total planned area of Dholera SIR, formed from 22 villages of Dholera taluka
durable
Rs 91,000 cr
Approved cost of the Tata and PSMC semiconductor fab, a chip-making plant now under construction
durable
~300 MW
Solar capacity actually built and generating, out of the 1,000 MW that has been sanctioned
durable
>8,00,000
Jobs promised once the city is fully built. This is a promise about the future, not a count of anyone working there today
target

Sources: the official Dholera SIR site run by the Gujarat government, PIB press releases for the chip plant, the Central Electricity Authority quarterly solar parks report, and the NICDC delivery-monitoring report. Open any answer on the site for the full citation.